This section calculates conductance of stream-bed, river or lake-bed, in relation to such us groundwater. Below is the general equation for stream-bed conductance:
Enter the following parameters:
**********
Given:
Hydraulic Conductivity of Stream-bed: m/s
X-Sectional Area: m2
Thickness of Stream-bed Sediments: m
----------
Result:
Stream Conductance (m2/s):
Stream Conductance (m2/d):0
Stream Conductance (m2/y): 0
**********
For comments and/or ideas, click here to contact us.
Back to Calculators Index Page
Online Calculator | Stream Conductance, River Conductance
Order SIMAHPP
Download